Stamford High School Facilities Projects(Updated February 2024) |
||
Project in Process: |
Anticipated Start Date |
Impact of Project |
Electronic door control for exterior doors* | Summer 2024 | Prioritizing the safety and well-being of our students, staff and facilities, keyless entry solutions are being added to all school facilities as part of our district-wide adoption of integrated security systems. |
Window air-conditioning | Fall 2024 | Work is related to improved air quality and circulation (AC/Heat/Circulation system) |
Replace AHU 1A and 1B | Summer 2024 | AHU 1A and 1B will be replaced. 1A will be converted to RTU. |
Partial Roof Replacement Project | Summer 2024 | Partial Roof Replacement Project |
Partial Interior Renovation | Summer 2024 | Partial Interior Renovation - 1927 building top floor. |
Completed Projects: |
||
major summer cleaning | Summer 2023 | Over the summer all school buildings underwent their major summer cleaning (deep clean of all major educational spaces - furniture and fixtures are removed from all classrooms, the floors/walls are deep cleaned and then the roos are restaged). |
Floor stripped and waxed | Summer 2023 | Stripping and refinishing is the process of removing old layers of wax and dirt, restoring the floors to a like-new appearance and protecting it from future damage. |
Grounds Related Projects: |
||
Perimeter | Ongoing | SPS has engaged a site contractor to clear away overgrowth / weed / poison ivy / etc. along the perimeter of the school property. |
North Courtyard | Ongoing | School grounds were added to the district-wide organic lawn maintenance program which includes regular aeration and fertilization. |
Trailers | Fall 2023 | Trailers are being removed or replaced with newer equipment owned by SPS. Trailers are used for on-site storage of furniture and equipment. |
*Denotes a Capital Project managed by the City |
Building a better future for Stamford Public Schools
Multipurpose Athletic Field (updated February 2024)
The City of Stamford with the Stamford Public Schools has received three million dollars in grant funding from the Department of Community Development (DECD) and the Department of Environmental and Energy Protection (DEEP) to improve the functionality of its athletic fields for the Stamford Highschool Community. The project includes the creation of a new synthetic turf baseball field and new synthetic multipurpose field across a synthetic baseball field.
The new campus will improve the students access to improved on site athletic activities and the work will improve subsurface drainage, accessible walkways, the baseball backstop, fencing. The project began construction in September of 2023 and construction is anticipated to be completed in time for the Spring 2024 athletic season.
Upper Soccer Field (updated 9/26/23)
The Mayor’s Office is aware of the concerns raised by the Athletic Director and parents regarding the condition of the upper soccer field. I know the school community received an update from Stamford Public Schools regarding steps that have been taken by the Stamford Public Schools Facilities team. The City is working with SPS to secure a third-party professional consultation to review the condition and composition of the Upper Soccer Field. The City’s goal is to act on professional recommendations that can be implemented for long - term solutions that will complement the continued maintenance by the SPS Facilities team.
Additionally, the City’s Parks and Recreation Department, in conjunction with Stamford Public Schools and Stamford High School Athletic Director, are working to identify city field space for any games needed in the meantime.